Installation of BIANNA Recycling equipment
We offer a photoreport of equipment installation of BIANNA Recycling garbage factory in Girona, Spain. September, 2018
We offer a photoreport of equipment installation of BIANNA Recycling garbage factory in Girona, Spain. September, 2018
We offer a photo report of installation in Montgomery(Alabama) in September, 2018.
We offer a photo report on the installation work of the Ashurbrick building ceramics plant in Kurdistan.
LLC “GianClaySolution” in cooperation with Direxa Engineering executes the installation supervision of the line for the production of metallurgical briquettes at the Novolipetsk Steel …
LLC “GianClaySolution” in cooperation with Direxa Engineering and CLEIA SAS began assembling equipment for the building ceramics factory in Montgomery (Alabama).
LLC “GianClaySolution in cooperation with BUILD EXPORT CONSULTING(France) has assebled the instalation for testing pipe connections produced by Pinette P.E.I. (France)
LLC “GianClaySolution” began assembling equipment for the building ceramics factory in Tunisia (Bricueterie Jebel Oust, Zaghouan, Tunisie). Equipment was established by Equipceramic S.A.
Pinette Emidecau Industries (PEI) is an industrial engineering company that designs and supplies molding and testing equipment, automated production lines, custom machines, and turnkey …
A production line has been installed at this enterprise, intended for the manufacture of BREX briquettes consisting of manganese dust and a fine fraction (<10 …
The project began in 2015 in the city of Setif, Algeria. The equipment was supplied by Equipceramic. Our company provided installation services. Equipment was installed for the production of …