Year Country Customer Type of work
2016 Kurdistan, Sulimania Cleia Installation supervision of a production line with a capacity of 150 million per year. Control of manufacturing non-standard equipment.
2016 Algeria, Batna Equipceramic Control of industrial line supply and installation.
2016 USA, Texas, g. Henriet Direxa Installation of lines for the production of brick blocks at Triangle Brick Company.
2016 USA, Ohio, New Langington Direxa Reconstruction of the furnace in the factory LUDOWICI SITE.
2016 USA, Denver, Colorado Direxa Design and development of documentation for the further implementation of the project.
2016 Australia, Brisbane Direxa Reconstruction of the furnace, installation and configuration of technological maps. Personnel training for correct operation of the furnace.