Year | Country | Customer | Type of work |
2016 | Kurdistan, Sulimania | Cleia | Installation supervision of a production line with a capacity of 150 million per year. Control of manufacturing non-standard equipment. |
2016 | Algeria, Batna | Equipceramic | Control of industrial line supply and installation. |
2016 | USA, Texas, g. Henriet | Direxa | Installation of lines for the production of brick blocks at Triangle Brick Company. |
2016 | USA, Ohio, New Langington | Direxa | Reconstruction of the furnace in the factory LUDOWICI SITE. |
2016 | USA, Denver, Colorado | Direxa | Design and development of documentation for the further implementation of the project. |
2016 | Australia, Brisbane | Direxa | Reconstruction of the furnace, installation and configuration of technological maps. Personnel training for correct operation of the furnace. |